Hi Group – Energy Centres, UK Wide
Client Background & Needs Hi Group is a leading provider of sustainable energy centres across the UK, with facilities in Barnstaple, Accrington, Nelson, Maidstone, and Gillingham. These sites integrate renewable technologies such as solar panels, battery storage, and heat pumps—enabling each building to operate like a mini power plant that generates, stores, and distributes energy […]
Whittington House, London – Lightning Protection System Assessment
Client Background & Needs Whittington House is a prominent office building in central London requiring a detailed Lightning Protection System (LPS) assessment to ensure compliance with modern safety standards. Lightning Protection Systems are critical to safeguarding buildings, equipment and most importantly, people from the potentially devastating effects of lightning strikes. Modern LPS still rely on […]
Fault and Grading Study for Hydrocarbon Processing Plant
Client Background & Needs Following the acquisition of a hydrocarbon processing plant by a large multinational corporation, the site’s 11kV high voltage switchgear and low voltage distribution boards required recommissioning after being dormant for several years. To ensure a safe and compliant electrical system, the client engaged us to perform a fault and grading study […]
Harmonic Load Flow Analysis for Factory Expansion
Client Background & Needs A manufacturing facility undergoing expansion required an additional arc furnace as part of a major site upgrade. The site was already experiencing elevated harmonic levels due to ageing arc furnaces, yet no G5/4 assessment had previously been conducted. To accommodate the new arc furnace, the factory required an upgraded 11kV supply. […]
11kV Solar Farm: Earthing Design and Commissioning
Client Background & Needs This Solar Farm is a renewable energy site designed to provide sustainable electricity to approximately 1,750 homes for an entire year. As part of the UK’s ongoing transition to greener energy sources, the solar farm plays a crucial role in reducing carbon emissions and supporting the National Grid. Given the site’s […]
EV Bus Charger Infrastructure
Client Background & Needs A large bus operator required infrastructure upgrades to support their transition to electric buses in Sunderland. As a leading transport provider, they sought to repurpose their existing bus depot while ensuring minimal disruption to their day-to-day operations. With extensive experience in similar projects, we were chosen to deliver a fast, efficient, […]